They just completed sealing our driveway and it looks really good. The fellows used a 4 step process: 1) Thorough cleaning using heavy duty sweeper 2) Gator seal applied to areas with web style cracks (alligator appearance) 3) Crack seal with hot rubber-like tar 4) Brush and spray on a thick coat of armor seal.
The process took two days (allowed the gator seal to set up) and they were very thorough to make sure the driveway was super clean between steps. They used metal brushes on the moss on the sides.
I’m confident that our driveway is in much better shape now and that we’re ready for the heavy rains and deep snow this winter.


